Switch to: References

Add citations

You must login to add citations.
  1. A Proactive Robust Scheduling Method for Aircraft Carrier Flight Deck Operations with Stochastic Durations.Xichao Su, Wei Han, Yu Wu, Yong Zhang & Jie Liu - 2018 - Complexity 2018:1-38.
    Download  
     
    Export citation  
     
    Bookmark  
  • Towards Complexity and Dynamics: A Bibliometric-Qualitative Review of Network Research in Construction.Dongping Cao & Shiting Shao - 2020 - Complexity 2020:1-19.
    Social network analysis has gained increasing academic attention in the construction domain over the past two decades due to its capability to characterize the complexity and dynamics of interindividual and interorganizational interactions. To date, however, scant attempt has been made to develop an integrated framework to systematically review the diversified network research at different levels in this domain and to quantitatively characterize the evolution of related research interests and research instruments. This study aims to fill this gap by conducting a (...)
    Download  
     
    Export citation  
     
    Bookmark   1 citation  
  • Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast.P. Urgilés, J. Claver & M. A. Sebastián - 2019 - Complexity 2019:1-11.
    All projects take place within a context of uncertainty. That is especially noticeable in complex hydroelectric power generation projects, which are affected by factors such as the large number of multidisciplinary tasks to be performed in parallel, long execution times, or the risks inherent in various fields like geology, hydrology, and structural, electrical, and mechanical engineering, among others. Such factors often lead to cost overruns and delays in projects of this type. This paper analyzes the efficiency of the Earned Value (...)
    Download  
     
    Export citation  
     
    Bookmark