Drobeta Turnu Severin Heavy Water Plant: Functioning and Shutting Down

Cunoașterea Științifică 2 (2):27-36 (2023)
  Copy   BIBTEX

Abstract

Due to the special working conditions in the heavy water plant, an extensive research and program has been developed for the operational safety of the installations, based on specific action methodologies and in situ experimental programs for the evaluation of the long-term behavior of materials and installations. After December 1989, the operation of the modules was stopped for about three years, for the modernization of the technological equipment and the surveillance and environmental protection systems. In September 2015, the production of heavy water was stopped and the plant staff was laid off.

Author's Profile

Nicolae Sfetcu
Romanian Academy

Analytics

Added to PP
n/a

Downloads
248 (#79,171)

6 months
172 (#18,533)

Historical graph of downloads since first upload
This graph includes both downloads from PhilArchive and clicks on external links on PhilPapers.
How can I increase my downloads?